Mini-FSA stage 3 equipment for an SPS
MAR Consulting performed a functional safety assessment (FSA) stage 3 for an engineering contractor and equipment supplier to a subsea production system (SPS). The SPS will be installed and operated in the Norwegian Continental Shelf (NCS). The equipment designed by the engineering company constituted the boundary for the FSA. The equipment is similar to the SPS currently in production in the tie-in field. Hence, the FSA focused mainly on installation, commissioning, and validation activities. MAR Consulting acted as an independent assessor to the project. The objectives were to ensure the equipment is fit for the safety instrumented functions; and is […]