RAM analysis subsea tie-back

MAR Consulting supported the development of a Reliability, Availability, and Maintainability (RAM) study for a new field subsea tie-back in the Norwegian Continental Shelf (NCS).

The objective of the study was to provide the production efficiency (PE) estimates for the subsea field value chain in accordance with a revised base case and a high-level assessment for other three cases with different number of wells. In addition, a sensitivity analysis was performed for increased mobilization times due to no spare parts for the subsea production system (SPS), and subsea umbilical riser flowline (SURF).

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.